Thursday, September 20, 2007

How to work diffrent locations without heavy cleanup

When You work for a contractor that has a lot of small work spread through the area. Try to always keep chutes as few as possible. If You have a flip down That gives You plenty of chute for most sidewalks and apron's. You may have to add one or two here and there.

After each stop scrape chute so make sure you don't let out to much so your chute is full of cement. Scrape chute and when you get to the next open hole rinse the cement build up on the highest points of each chute into the open side walk don't go crazy this is to keep from a hard cleanup later on the edges will do just fine.

No comments: